Birmingham, Alabama
New Beginnings United Methodist Church required repairs and re-wiring made to a previous installation along with installation of new PA equipment. New Atlas and Crown amplifiers, Community PA Speakers, AKG and Countryman microphones were used for the equipment
New Equipment Installation and Re-wiring
New Atlas and Crown Amplifiers were used with Community PA Speakers to provide sound for the Sanctuary.
Bad Connections in Floor Jacks
The microphone floor jacks had large amounts of static and radio interference from the outside.
Testing of Wiring and Connections
The wires and connections were individually tested to determine which ones are faulty and where the interference was coming from.
Installing New Wire and Repairing Connections
After the testing is completed, the faulty wiring is replaced and bad connections are re-soldered.