Gardendale, Alabama
We finished the attic of this garden home with no basement to give the homeowners an upstairs den area.
Unfinished Attic in Garden Home
This is an unfinished, one-room in the attic of a single floor home. To finish the room would require installing electrical, HVAC, and insulation in the space first.
Framing and Insulation
Here the knee wall has been constructed with the electrical installed. Before insulation could be placed between the roof joists, airways had to be installed so that the shingles would not overheat.
Sheetrock Installation and Finishing
Sheetrock installation began after the insulation and electrical was installed.
Carpet and Trim Installation
Here we are in the final phases after the carpet has been installed. The final touch-ups to the paint, installing the closet door and electrical covers.